Napa Redevelopment Partners
Napa Pipe Development Project
Project Information
Location: Napa, CA
Services Provided: QA Inspection
Overview
Providing inspection services for this $100M ongoing project consists of the redevelopment of the Napa Pipe yard into new housing (residential and commercial) development. Work includes widening and reconstruction of Highway 221 at Kaiser Road, including construction and reconstruction of signalized intersections. The project Includes the deconstruction/demo of 3 bridges over sensitive Napa River waterway and the construction of 2 new bridges over the Napa River and new road alignment and road widening. Construction of two new roundabouts, mass grading, land development, new utilities, and tie-ins (gas, potable, sewer, recycle lines, communications, electrical). Piping includes placement of 10,000 LF 8-24 inch domestic water lines in addition to the placement of HDPE, CMP, Epoxy coated steel pipe. ~4miles of new streets. The project includes coordination with multi agencies due to their jurisdiction such as City of Napa, Caltrans, UPRR, Napa Sanitation District, CDFW, Army Corp. of Engineers, RQWCB, and California Coastal Conservancy.